Skip header
Logo Swietelsky-Faber
Skip navigation
  • Services
  • Projects
  • Company
    • About us
    • News
    • Events
    • Locations
    • Downloads
  • Careers
    • Open positions
    • Students
    • Training
    • Interviews
  • Contact
  • de
  • Services
  • Projects
  • Company
    • About us
    • News
    • Events
    • Locations
    • Downloads
  • Careers
    • Open positions
    • Students
    • Training
    • Interviews
  • Contact
  • Home
  • Company
  • News

News

  • Show all
  • Training
  • Career
  • We act
  • Projects
  • Team
Poster for Wiener Abwassertage 2026 about sustainable infrastructure maintenance, 10–11 June 2026.

Sustainability starts with the right decisions!

17.08.2026 | We act

Construction worker at a street dig site beside an open manhole and drilling rig on a city road.

Bremen: Combined sewer in egg-profile renovated with UV liner

30.04.2026 | Projects

Black-and-white photo of a man in a suit standing with arms crossed beside a reflective glass wall.

Caution at the platform edge…

01.04.2026 | Team

A modern passenger train travels along frosty railway tracks beside houses and maintenance vehicles.

Gifhorn: Premiere in the railway environment of Deutsche Bahn

28.02.2026 | Projects

Black utility cables and pipes with blue stripes laid in a trench with orange straps and construction debris.

Bodenheim: Close-fit method secures drinking water transport pipeline

28.02.2026 | Projects

Worker in protective suit spraying foam insulation onto a wall during construction.

Staßfurt: Sustainable coating of a brine tank

28.02.2026 | Projects

Black and white photo of a man in a casual jacket standing with hands in pockets near garden plants and an arched wrought iron gate

A "continue as before" is not an option…

05.02.2026 | Training

Person in protective gear spraying inside a dimly lit underground tunnel

Oberaudorf: Concrete rehabilitation of the Röthenbach stream culvert

30.11.2025 | Projects

An orange-and-white delivery truck parked beside a yellow building with a sign in German.

Tegernsee Brewery: Trenchless manhole rehabilitation with polyurea

30.11.2025 | Projects

Page 1 of 4

  • 1
  • 2
  • 3
  • 4
  • Next
  • Last
Logo Swietelsky-Faber

Bold, precise, future-oriented.

Swietelsky-Faber stands for leading solutions in trenchless pipe rehabilitation. With state-of-the-art technologies, sustainable methods, and an experienced team, we secure infrastructure efficiently, with minimal use of resources, and in a future-proof way – for generations.

Services

Skip navigation
  • Services

 

Projects

Skip navigation
  • Projects

Company

Skip navigation
  • About us
  • News
  • Events
  • Locations
  • Downloads

Career

Skip navigation
  • Career
  • Open positions
  • Students
  • Training
  • Interviews
Green DEKRA certification badge indicating quality or approval for services.
The TÜV Süd logo represents a certification of quality and safety in various industries, marked by a distinctive hexagonal shape and blue colors.
The TÜV SÜD logo, a blue octagonal emblem representing safety and quality certification.
The TÜV SÜD logo, representing compliance with ISO 14001 standards for environmental management.
Logo of the RAL Gütezeichen KANALBAU certification mark with circular emblem and blue text block
The logo of a sports club featuring a blue 'Z', a circular emblem with a castle in red, and the words associated with the club.
A certification seal displaying a logo and the year 2024, representing authenticity and validity.
Stylized logo featuring the letters 'PQ' and 'VOB' in a modern font.
Logo of ACCET, an accreditation body for educational institutions, featuring a circular design in orange and white.
Logo of EMB Wertemanagement Bau, highlighting values: Values, Compliance, Integrity.

© 2026 Swietelsky-Faber GmbH Kanalsanierung

Privacy Policy Legal Notice