Short liner

Targeted rehabilitation in the shortest possible time

The short liner is a proven trenchless method for targeted rehabilitation of defective pipelines. It is particularly suitable for local defects and enables fast, economical, and permanently effective repair.

The system is based on an ECR glass fiber laminate that is impregnated with a silicate resin and adapted to the structural requirements of the respective damage case.

For which pipelines is the process suitable?

Nominal diameter range

DN 100 – DN 800

Existing pipe materials

Concrete, stoneware, cast iron, steel, plastic (except PE-HD)

Pipe geometry

Round and egg-shaped profiles

Operating condition

Renovation during ongoing operation is usually possible (dry-weather flow)

Areas of application

  • Municipal sewer pipes

  • Stormwater and combined sewer systems

  • Property drainage

  • Industrial and drainage pipelines

  • localized damage points without full rehabilitation

This is how the short liner works

After thorough cleaning of the damaged area, a resin-impregnated glass-fibre laminate is positioned precisely in the damaged section using a pneumatic packer system.

The liner is pressed against the inner wall of the pipe and hardens there in a short time (cold curing). As a rule, the rehabilitation area is load-bearing again after just a few hours.

By using through-packers, wastewater operations can in many cases be maintained during the rehabilitation.

Construction & material properties

  • ECR glass-fibre laminate, multi-layered depending on statics
  • Silicate resin system for impregnation
  • Wall thickness after curing approx. 3–5 mm
  • Form-fit and force-fit bond through resin exudation
  • High resistance to corrosion and abrasion

Short liner in practice

Frequently Asked Questions

Everything else you need to know about the technology

When is the short liner used?

The short liner is used when individual damaged areas need to be renovated locally and quickly, without renewing the entire pipeline.

How large is the renovation area?

Depending on the damage pattern, areas of approx. 0.5 to 4 metres can be renovated.

Which materials are suitable?

The short liner can be used in pipes made of concrete, stoneware, cast iron, steel, and plastic – but not in PE-HD pipes.

How long does the renovation take?

The entire renovation, including curing, usually takes only a few hours.

Does the pipeline remain in operation during the renovation?

In many cases, yes. By using through-flow packers, dry-weather flow can often be maintained.

What advantages does the short liner have?

It offers a fast, economical, and durable solution for localised damage with minimal disruption to operations.